Skip to content
GBUG Guildford Bike User Group
  • About Us
  • Local Routes
    • Family friendly routes
    • Christmas Pie Trail
    • Downs Link
    • Towpath
    • National Cycle Network routes
    • GBUG ‘Tube Map’
    • Plan a route
  • Local Clubs
  • GBUG Campaigns
    • London Road Active Travel Scheme
    • Pedestrian and Cycle Crossing Timings
    • Walnut Tree Close One Way System – Success!
    • Guildford-Godalming Greenway
    • Safe Route to Guildford Station
    • North Street Development Mini Holland
    • Low Traffic Neighbourhoods (LTNs)
    • M25/A3 Junction – Pedestrian, Cyclist and Horse Rider Routes
    • Gosden Hill Farm Development (Burpham)
    • Weyside Urban Village (Slyfield)
    • Woodbridge Meadows Footbridge Conversion
    • Council Plans and Strategies
      • Emergency Active Travel Fund (EATF)
      • Sustainable Movement Corridor (SMC)
      • Guildford Town Centre Transport Package
      • Guildford E-Bike Share Scheme and Cycle Network Study
      • Guildford Strategic Sites
      • Local Cycling and Walking Infrastructure Plan (LCWIP)
      • Guildford major transport schemes
      • GBC/SCC ‘Quick Wins’ for cycling
    • Reporting traffic violations
    • Reporting potholes
  • Events
  • Archive
  • Join Us
  • About Us
  • Local Routes
    • - Family friendly routes
    • - Christmas Pie Trail
    • - Downs Link
    • - Towpath
    • - National Cycle Network routes
    • - GBUG 'Tube Map'
    • - Plan a route
  • Local Clubs
  • GBUG Campaigns
    • - London Road Active Travel Scheme
    • - Pedestrian and Cycle Crossing Timings
    • - Walnut Tree Close One Way System – Success!
    • - Guildford-Godalming Greenway
    • - Safe Route to Guildford Station
    • - North Street Development Mini Holland
    • - Low Traffic Neighbourhoods (LTNs)
    • - M25/A3 Junction – Pedestrian, Cyclist and Horse Rider Routes
    • - Gosden Hill Farm Development (Burpham)
    • - Weyside Urban Village (Slyfield)
    • - Woodbridge Meadows Footbridge Conversion
    • - Council Plans and Strategies
      • - - Emergency Active Travel Fund (EATF)
      • - - Sustainable Movement Corridor (SMC)
      • - - Guildford Town Centre Transport Package
      • - - Guildford E-Bike Share Scheme and Cycle Network Study
      • - - Guildford Strategic Sites
      • - - Local Cycling and Walking Infrastructure Plan (LCWIP)
      • - - Guildford major transport schemes
      • - - GBC/SCC ‘Quick Wins’ for cycling
    • - Reporting traffic violations
    • - Reporting potholes
  • Events
  • Archive
  • Join Us

Category: Pedestrian and Cycle Crossing Timings

A busy pedestrian crossing

Pedestrian and Cycle Crossings: We need your help!

30/09/2024JuliaArchive, Pedestrian and Cycle Crossing Timings

Have you ever waited at a pedestrian or cycle crossing and wondered why it takes so long for the green person or cyclist to appear? And why road users wait less time? GBUG are currently campaigning to improve pedestrian and cycle crossing timings in Guildford. Please sign our petition. For more information on why this is important…

Read More

Developed by Think Up Themes Ltd. Powered by WordPress.
  • Follow Us